LT bags order to set up solar power plant in Dubai on January 30, 2024 at 5:20 am

The order has been bagged by the renewable engineering, procurement, and construction (EPC) arm of LT#39;s power transmission and distribution business.

Leave a comment

Your email address will not be published. Required fields are marked *